Categories Capacity planning
Created by Reilly O'Connor
Created on Aug 24, 2023

Capacity report is inconsistent in calculation of available capacity

On the capacity report, we show a user or team's available capacity in two places: when hovering over a particular month on the timeline, and when drilling into that month in the lower panel.

In the body of the report, we show the "Available" capacity as Capacity - (Planned + Completed). When parallel planning is selected (as opposed to sequential planning), in the lower panel, it is only Capacity - Planned.